TY - Type of reference TI - EasySched: a multi-agent architecture for the predictive and reactive scheduling of Industry 4.0 production systems based on the available renewable energy AU - Maroua Nouiri AU - Damien Trentesaux AU - Abdelghani Bekrar AB - Industry 4.0 is concerned with sustainable development constraints. In this context, we propose a multi-agent architecture, named EasySched, aiming at elaborating predictive and reactive scheduling as the result of a coordination between systems producing goods and systems producing renewable energy. The validation of this architecture is original, and was conducted in a completely and physically distributed way, using networked embedded systems. This validation was done on a series of instances inspired by the literature. The results showed that EasySched succeeds in adapting the production of goods according to the available renewable energy. DO - 10.21494/ISTE.OP.2019.0375 JF - Industrial and Systems Engineering KW - production, predictive scheduling, reactive scheduling, renewable energy, Multi agent model, particle swarm optimization, embedded systems, ordonnancement prédictif, production, ordonnancement réactif, énergies renouvelables, modélisation multi-agent, Optimisation par essaims particulaires, systèmes embarquées, L1 - http://openscience.fr/IMG/pdf/iste_induprod19v2n1_1.pdf LA - en PB - ISTE OpenScience DA - 2019/04/10 SN - 2632-5993 TT - EasySched : une architecture multi-agent pour l’ordonnancement prédictif et réactif de systèmes de production de biens en fonction de l’énergie renouvelable disponible dans un contexte industrie 4.0 UR - http://openscience.fr/EasySched-a-multi-agent-architecture-for-the-predictive-and-reactive-scheduling IS - Issue 1
VL - 2 ER -